Cable Installation Engineering
When installing cables, many different environmental factors are encountered combined with equipment limitations. This can create complex situations and major challenges.
As there is no room for miscommunication, and cables are the lifelines of every windfarm project, we have specialized in this challenging discipline. Our engineers prepare your project and guide you in project preparations, trenching and cable laying. Where necessary, our professionals can be deployed to take a leading role in the implementation on board the vessel, or assist from onshore (liaison with subcontractors such as provider of Cable Protection System).
On location, our field engineers ensure that the planning is monitored, that the execution of the project runs safely and smoothly and that problems are solved creatively and quickly.
- Trenching
- Cable lay
- Cable pull-ins (J-tube/beach pull etc.)
- Contingencies Procedures
- Procurement / Logistics Support
- Field engineering services
Track record
Pipeline installation engineering
With our many years of experience in delivering installation manuals, method statements and procedures, we not only ensure a structured start, but also an efficient progression of the entire project. Additionally, we can provide realistic cost and time estimates. This ensures that a thorough project plan can be made to give you an insight into the costs involved in the work to be carried out.
During execution, our field engineers monitor the planning and activities to ensure that the execution of the project runs safely, efficiently and that problems are solved innovatively and rapidly. We do this by devising new ways of working or adapting existing methods to suit the current project.
- Pipelay & Trial Procedures
- PLEM/PLET Installation Procedures
- Subsea Crossings & Landfall Procedures
- Contingencies Procedures
- Procurement / Logistics Support
- Field engineering services
- Office based support
Subsea Umbilicals, Risers & Flexibles (SURF) Installation
Each project has its own challenges. Changing environmental factors mean that each project requires different methods and materials to ensure the success of the project. Our engineers support you in project preparations such as selecting the most suitable materials and equipment for your project and guide you during its purchase. Furthermore, we can be on site during the installation to assist in the many challenges of executing SURF projects.
- SURF Installation Methodology
- Procurement / Logistics Support
- Field engineering services
- Office based support
Track record
Installation of Structures and Foundations
What materials and equipment are needed to transport and install subsea structures and foundations? How long will this take? What does it cost to execute the whole project? And what equipment is needed to get everything in place? These are questions that our engineers are happy to answer.
With our extensive experience in heavy lifting and structural / foundation installation projects, we not only advise you in the planning and use of materials/equipment; but also develop installation manuals, method statements and procedures. We can provide the suite of documentation and expertise required to make the installation of structures and foundations run as quickly and safely as possible. Moreover, it is also possible to be supported by us in analysis required for the laying and/or installation of the foundations and structures.
- Jackets
- Monopiles
- Piling
- Field engineering services
- Office based support