Project description:
Boskalis has been awarded the export cable installation contract for the Ostwind 2 offshore grid connection. The contract scope comprises of design and installation of approximately 270 kilometer export cable that will connect the planned Arcadis Ost 1 and Baltic Eagle offshore wind farms to the onshore substation in Lubmin, Germany. The project is expected to commence in 2019 with a planned completion late 2022.
OI's scope of work:
ARC’s scope of work:
Boskalis has contracted ARC to provide the following:
Prepare procedures related to the:
- Anchor Handling Operations
- Cable Installation and Burial
- Sea Trial Operations
- Cable burial
Prepare Method Statements for Permit Application:
- Cable Installation and Burial in the 12nM zone
- Cable Installation and Burial in the EEZ zone
Prepare As-Built Documentation:
- Cable Loading Report
- Cable Installation and Burial
- Mattress Installation at crossings