Ostwind 2 - Engineering Support

Boskalis

Project description:

Boskalis has been awarded the export cable installation contract for the Ostwind 2 offshore grid connection. The contract scope comprises of design and installation of approximately 270 kilometer export cable that will connect the planned Arcadis Ost 1 and Baltic Eagle offshore wind farms to the onshore substation in Lubmin, Germany. The project is expected to commence in 2019 with a planned completion late 2022.

OI's scope of work:

ARC’s scope of work:

Boskalis has contracted ARC to provide the following:

Prepare procedures related to the:

  • Anchor Handling Operations
  • Cable Installation and Burial
  • Sea Trial Operations
  • Cable burial

Prepare Method Statements for Permit Application:

  • Cable Installation and Burial in the 12nM zone
  • Cable Installation and Burial in the EEZ zone

Prepare As-Built Documentation:

  • Cable Loading Report
  • Cable Installation and Burial
  • Mattress Installation at crossings
Share this page

Related projects

 
Seaway 7

Yunlin (2022) Tender support

See project
 
Petrol Ofisi

Antalya Terminal Pipeline Extension Verification of detailed design

See project
 
Tideway

Hornsea Export Cable Platform Pull in Analysis

See project
Back to top