Project description:

Boskalis has been awarded the export cable installation contract for the Ostwind 2 offshore grid connection. The contract scope comprises of design and installation of approximately 270 kilometer export cable that will connect the planned Arcadis Ost 1 and Baltic Eagle offshore wind farms to the onshore substation in Lubmin, Germany. The project is expected to commence in 2019 with a planned completion late 2022.

OI's scope of work:

ARC’s scope of work:

Boskalis has contracted ARC to provide the following:

Prepare procedures related to the:

  • Anchor Handling Operations
  • Cable Installation and Burial
  • Sea Trial Operations
  • Cable burial

Prepare Method Statements for Permit Application:

  • Cable Installation and Burial in the 12nM zone
  • Cable Installation and Burial in the EEZ zone

Prepare As-Built Documentation:

  • Cable Loading Report
  • Cable Installation and Burial
  • Mattress Installation at crossings
Share this page

Related projects

 
SPT Offshore

POB foundation Installation Installation Engineering

See project
 
Bluestream

Nexstep (2022) Sea fastening on Ievoli Ivory Deck

See project
 
Port of Rotterdam

CO2 Pipeline Feasibility Study and Preliminary Design

See project
Back to top