Ostwind 2 - Engineering Support

Boskalis

Project description:

Boskalis has been awarded the export cable installation contract for the Ostwind 2 offshore grid connection. The contract scope comprises of design and installation of approximately 270 kilometer export cable that will connect the planned Arcadis Ost 1 and Baltic Eagle offshore wind farms to the onshore substation in Lubmin, Germany. The project is expected to commence in 2019 with a planned completion late 2022.

OI's scope of work:

ARC’s scope of work:

Boskalis has contracted ARC to provide the following:

Prepare procedures related to the:

  • Anchor Handling Operations
  • Cable Installation and Burial
  • Sea Trial Operations
  • Cable burial

Prepare Method Statements for Permit Application:

  • Cable Installation and Burial in the 12nM zone
  • Cable Installation and Burial in the EEZ zone

Prepare As-Built Documentation:

  • Cable Loading Report
  • Cable Installation and Burial
  • Mattress Installation at crossings
Share this page

Related projects

 
H2Offshore

3D modeling of barge and steelworks for Greater Changhua OWF (Taiwan)

See project
 
Undisclosed client

Pipelay Project Pipelay Operations Engineering

See project
 
VBMS

Cable Basket and Lift Spreader Design Engineering Support

See project
Back to top