Installation Engineering Support

Bluestream

Project description:

F2-A Hanze platform is connected via a 4” gas export flexible pipeline with the A6-F3B gas pipeline. Next to this pipeline an umbilical has been installed (piggy bagged to the flexible). The flexible pipeline is > 10 years old and need to be replaced with a new flexible. The umbilical will stay in place and the old flexible pipeline will be abandoned.

OI’s scope of work:

Provide Installation Engineering support including but not limited to:

  • Installation analysis
  • Installation procedures.
  • Installation drawings.
Share this page

Related projects

 
Van Oord

Strategic Support

See project
 
SPT Offshore

Suction Piles for Various Projects

See project
 
Jan de Nul

Tennet Offshore Cable System Repair

See project
Back to top