Fabrication drawing and structural assessment of the seafastening grillage for recovered hub.

OI’s scope of work:

Tadek has contracted Offshore Independents to execute the following scope of work:

  • 3D model of the seafastening grillage
  • Fabrication drawing of the grillage
  • Structural report

 