Viking Bravo Project Engineering

Boskalis

Project description:

Boskalis has requested OI to provide engineering support for the Viking Bravo 2020 Decommissioning Project.

  • Development and writing the project’s Transport Manuals;
  • Writing Rigging Design Reports under the supervision of the Sr. Rigging Project Engineer (also from OI);
  • Writing the scope of work document, for procurement of the Crawler Crane;
  • Elaborate a study IOT acknowledge the need for a boom extension for the Crawler Crane;
  • Elaborate a Technical Note, IOT demonstrate no tendency for uplift in the assets on deck, and minimal uplift during transport;
  • Calculation of the conversion of the Grid-True North, IOT update the project’s drawings accordingly;
  • Set-up the initial requirements for the Wave Rider Buoy.
  • Coordinate the design and fabrication of Lifting Appliances (Spreaderbar)
  • Responsible for heavy lift rigging engineering (coordination of draftsmen, structural engineers, project engineers)
  • Initiating procurement of heavy lift rigging
  • Interface between discipline and project engineers

.

Share this page

Related projects

 
Bluestream

Gemini OWF (2023) Procedure Development - Reburial Exposed Power Cable

See project
 
Undisclosed client

PLV upgrade & commissioning Pipeline Installation Engineering

See project
 
Seaway 7

Seagreen OWF (2021-2023) Marshalling Yard Engineer at Nigg

See project
Back to top