Viking Bravo Project Engineering

Boskalis

Project description:

Boskalis has requested OI to provide engineering support for the Viking Bravo 2020 Decommissioning Project.

  • Development and writing the project’s Transport Manuals;
  • Writing Rigging Design Reports under the supervision of the Sr. Rigging Project Engineer (also from OI);
  • Writing the scope of work document, for procurement of the Crawler Crane;
  • Elaborate a study IOT acknowledge the need for a boom extension for the Crawler Crane;
  • Elaborate a Technical Note, IOT demonstrate no tendency for uplift in the assets on deck, and minimal uplift during transport;
  • Calculation of the conversion of the Grid-True North, IOT update the project’s drawings accordingly;
  • Set-up the initial requirements for the Wave Rider Buoy.
  • Coordinate the design and fabrication of Lifting Appliances (Spreaderbar)
  • Responsible for heavy lift rigging engineering (coordination of draftsmen, structural engineers, project engineers)
  • Initiating procurement of heavy lift rigging
  • Interface between discipline and project engineers

.

Share this page

Related projects

 
SPT Offshore

Suction Piles for Various Projects

See project
 
Petrol Ofisi

Antalya Terminal Pipeline Extension Verification of detailed design

See project
 
Seaway7

Audrey AB platform removal Engineering Support

See project
Back to top