Project description:
The Golfinho development consists of connecting several subsea wells to the onshore LNG plant. Van Oord is contracted to lay the shallow-water section of several
pipelines and umbilicals for this Mozambique LNG project.
OI’s scope of work:
Offshore Independents has been contracted by Van Oord to perform the detailed design of several pipe heads for several operations:
- Pull-in operation
- A&R operation
- AWTI operation
Each operation is performed for 6”, 8” and 22” pipelines.