Jeonnam Offshore Wind Farm

HESI

Project description:
Jeonnam Offshore Wind Farm is developed by JOWP (CIP and SK E&P), the first Korean large-scale commercial offshore wind project consists of 10WTG locations with an output power of 99 MW. JN1 is at approximately 8 km away from shore. HESI is the Tier 1 contractor for FOU supply and T&I for the project.

  • OI’s scope of work:
    OI has provided a Lead Engineer based in South Korea, who has supported the project with following activities:
  • Advise on installation procedures, installation equipment, engineering scopes & methods
  • Advise on contractual discussions with JOWP
  • Provide technical expertise on ground risks and mitigation solutions
  • Manage subcontractors
Share this page

Related projects

 
N-Sea

Gwynt Moor OrcaFlex Analysis

See project
 
RTA Offshore

Umbilical Load Out Analysis, Moss Norway

See project
 
Boskalis

Hollandse Kust West Beta

See project