Q10-A to P15-D Gas Export Line

Kistos

Project description:
The current Orion development produces gas reserves from a Normally Unattended Installation (NUI) located in 21 m water depth and ties back via a 42.5 km 14” export pipeline. An oil discovery in the field was appraised by Kistos in August 2021. To make the development of oil reserves economical, oil production is planned to be spiked into the current 14” gas export pipeline increasing multiphase flow conditions.

OI’s scope of work:
1. Basis of analysis
2. Corrosion assessment.
3. Pipeline suitability in principle.

Share this page

Related projects

 
Seaway 7

Seagreen (2022) HTV G&SF FEM Verification

See project
 
Tideway

Winch Reaction Forces

See project
 
Van Oord

Dos Bocas (2023) Lifting Plan

See project
Back to top