Project description:
In March 2015, New Age Cameroon Offshore Petroleum SA became Operator of the Etinde Permit offshore Cameroon. SPT was awarded the engineering study for the removal and of the F3-FA topside and relocation from North Sea to Cameroon.
OI’s scope of work:
The whole engineering scope consisted of approx. 12 packages. OI provided engineering support in the management of half of the work packages:
- Subcontractors management,
- Progress report,
- Lead structural engineering tasks.