Mozambique LNG

Subcon

Project description:

Pipeline stability under turbidity loads

OI’s scope of work:

Three Pipelines subjected to strong tubidity currents are protected with concrete mattresses.

Level 1 stability analyses have been performed to demonstrate the pipelines/mattresses integrity.

Share this page

Related projects

 
Heerema Marine Contractors

Shell Bonga Riser Installation Study

See project
 
ESD

Expert Cable Installation Consulting

See project
 
GEOxyz

Nederwiek 3 IBAS

See project
Back to top