Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.