Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
DEME Offshore

Sea fastening design of cable trenching equipment on board CSV Skandi Constructor

See project
 
Heerema Marine Contractors

Liwan & Ichthys Expert Engineering Support

See project
 
IRM systems

Above Water Tie-Ins (AWTI) Static Analysis

See project
Back to top