Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
Boskalis

Viking Bravo Project Engineering

See project
 
Boskalis

CPS stabilization - Rock bag installation

See project
 
Undisclosed client

Pipelay Project PLV upgrade & commissioning

See project
Back to top