Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
Subcon

Scour Protection for Mozambique LNG Project

See project
 
N-Sea

Wintershall Umbilical Repair (2022) Orcaflex Expert Analysis

See project
 
Bluestream

Installation Engineering Support

See project
Back to top