Drafting support for Subsea Clamp Installation

N-Sea

Project description:

N-Sea was tasked to provide diving support for the installation of steel clamps around 6 jackets, just below seabed.

OI’s scope of work:

Assist with drafting work for the  Deck Layout and Seafastening of all equipment onboard.
Also OI assisted in:

  • Vessel approaches,
  • Vessel clearances,
  • Umbilical lengths to ensure the guidelines and safety measures.