BOP foundations Installation Engineering

SPT Offshore

Project description:

SPT has requested OI to provide installation and HSE engineering support for the installation of two BOP foundations in China. The foundations are based on a cluster of Suction Pile technologies and installed at 2300m water depth and critical weather conditions.

OI’s scope of work:

  • Review project documentation
  • Drafting
  • Lifting Analysis, including definition of Lifting Arrangement, Specification and Support for Procurement
  • Vessel assessment and engagement support
  • Seafastening Design, including vessel motion
  • HSE Plan
  • Task Specific Risk Assessment
  • Offshore Installation & Retrieval Procedures – incl. Contingency
  • HAZID/HAZOP Meeting in China
  • Offshore Crew Briefing
Share this page

Related projects

 
Technip FMC

Karish FPSO Special Pipe Supports

See project
 
Seaway 7

Hollandse Kust Zuid (2022) Project Representative

See project
 
N-Sea

Project Engineering Support - Cable Repair (2024)

See project
Back to top