Audrey AB platform removal Engineering Support

Seaway7

Project description:

Subsea 7 is the EPRD contractor of the Audrey AB platform removal project. Seaway 7 scope consists of engineering, hook-down, removal and transportation to dismantling yard of platform structures

OI’s scope of work:

Seaway 7 requested OI to support them with the engineering works for platform removal. Following tasks have been performed:

  • Engineering checks of various reports
  • Perform Project Engineering tasks like subcontractor coordination, mobilization support, equipment lists, preparing manuals

 

Share this page

Related projects

 
Bluestream

Nexstep (2022) Sea fastening on Ievoli Ivory Deck

See project
 
DCN

50hertz (2022) Project Engineer for Fiberoptic Cable Repair

See project
 
Technip FMC

Karish FPSO Special Pipe Supports

See project
Back to top