Formosa 2 OWF (2022) Project/Field Engineering for Installation of OWF Foundations

Seaway 7

Project description:

Install the foundations (4x pin piles per location) at the OWF Formosa 2, Taiwan.

OI’s scope of work:

Project/Field Engineer(s) providing engineering support both offshore and on board Heavy Lift Vessel ”Seaway Yudin”, during the installation (via hammering) of the 4x pin piles meant for the subsequent installation of the jackets on which the wind turbine generators are situated.

Share this page

Related projects

 
Strohm

Lapa 6’’ Gas Injection TCP In-Place Analysis

See project
 
N-Sea

TenneT SLA

See project
 
TotalEnergies

Aramis - FEED engineering services for pipeline landfall and pipeline installation engineering for the Aramis offshore pipeline and its spurline

See project
Back to top