Dos Bocas (2023) Lifting Plan

Van Oord

Project description:

Dos Bocas consists of 3 PLEM installation. The PLEMs are a part of 3 pipelines connecting a refinery to 3 SPM buoys for offloading and loading of hydrocarbons to the FPSOs.

OI’s scope of work :

Part of the main scope that was developing the method statements, OI provided Van Oord with storyboards, lifting plans, rigging arrangements, fabrication drawings, anchor patterns and seafastening drawings.

Share this page

Related projects

 
Seaway 7

Hollandse Kust Zuid (2022) Project Representative

See project
 
VBMS

Modular Pipelay System Offpipe Support

See project
 
Seaway7

Audrey AB platform removal Engineering Support

See project
Back to top