Project description:

  • The CS Sovereign is to be used for a cable repair scope at the Race bank Wind Farm in water-depths of LAT 12.5m to HAT 20.5m.
  • Deburial, freelay, 1st and 2nd pull in analysis was completed.

OI’s scope of work:

  • Reviewing of the operational procedures for 1st end, 2nd end and freelay
  • Support with the identification critical stages
  • Support the optimization of the operational configuration
  • Run static and dynamic analysis to define the limiting sea state for each operation.