Project description:
Cable installation between OWF Riffgat and Gas platform N-05
OI’s scope of work:
OI will provide support to N-Sea in the form of project engineering onshore, focusing on project preparation to ensure a successful and streamlined operation. This scope covers several key aspects, including:
- Subcontractor management
- Mobilization preparation
- Leading PLGR scope
Documents for:
- Cable loading
- Cable Installation (1st & 2nd end)
- Rock Bag Installation
- Cut calculations
- Burial scope