One Dyas Cable installation

N-Sea

Project description:
Cable installation between OWF Riffgat and Gas platform N-05

OI’s scope of work:
OI will provide support to N-Sea in the form of project engineering onshore, focusing on project preparation to ensure a successful and streamlined operation. This scope covers several key aspects, including:

  • Subcontractor management
  • Mobilization preparation
  • Leading PLGR scope

Documents for:

  • Cable loading
  • Cable Installation (1st & 2nd end)
  • Rock Bag Installation
  • Cut calculations
  • Burial scope