Northern Maria OSV

Bluestream

Project description:
For incoming projects in North Sea (summer 2024), the Northern Maria (NM) was equipped with 3 new ROVs. To support ROVs, 2 extra platforms were designed and installed on board of the NM.

OI’s scope of work:
OI were asked to verify strength integrity of the new platforms installed on board of the NM, as well as main deck strength assessment. The platforms were designed and manufactured by 3rd party.

Share this page

Related projects

 
Petrogas

Pipeline Cleaning Projects (2022) Technical Scope Review

See project
 
Tadek Offshore

Wello Project

See project
 
HESI

JOWP - Monopile integrity analysis during lifting/upending operations

See project
Back to top