CPS stabilization - Rock bag installation

Boskalis

Project description:
Boskalis was awarded the stabilisation of the Cable Protection System (CPS) installed on the infield cables exiting the monopiles of the Sandbank & Hornsrev 3 (HR3) Offshore Wind Farms.

OI’s scope of work:
Boskalis Subsea Cables subcontracted OI for the following tasks:

  • Site visit for rock bag mock-up/test lift at rock bag manufacturer premises.
  • Office-based engineering support including delivery of rock bags installation procedure / method statement, deck layouts etc. and liaison with the Client (Vattenfall).
  • Offshore Field Engineering support on board the Offshore Support Vessel (OSV) North Sea Giant from late February – late April. Concluded by closeout work.
Share this page

Related projects

 
Bluestream

Nexstep (2022) Sea fastening on Ievoli Ivory Deck

See project
 
Heerema Marine Contractors

Shell Bonga Riser Installation Study

See project
 
DCN

50hertz (2022) Project Engineer for Fiberoptic Cable Repair

See project