Project description:
The MunmuBaram Floating Offshore Wind Project will be built between 65km and 80 km off the coast of Ulsan, South Korea with a total capacity of 1.3 GW of offshore wind power.
A preliminary assessment was given of the motions of a WTG nacelle and tower as installed free hanging from the crane of a floating mono-hull vessel. The analysis is performed to assess the motions of the nacelle, tower and vessel. The results should be combined with the TLP motions from a different analysis to determine the feasibility of the installation and the necessity of installation guides.
OI’s scope of work:
DEME Offshore contracted OI to provide the following:
- Dynamic analysis in OrcaFlex:
- Generator installation
- Tower installation
- Report:
- Graphical results
- Tabular results