Taiwan HDD Installation Analysis

IX Renewables

Project description:
Installation of an HDD extension pipe for a cable pull-in.

OI’s scope of work:
Calculation of the forces on the HDD in several installation scenarios.

Share this page

Related projects

 
N-Sea

N-Sea - Greece – Italy cable jointing

See project
 
DEME Offshore

Doggerbank OWF (2022-2023) Inter Array Cable and Export Cable Installation Analysis

See project
 
Reynard

Engineering Support for the Energy Island Pull-in (2023)

See project
Back to top