Taiwan HDD Installation Analysis

IX Renewables

Project description:
Installation of an HDD extension pipe for a cable pull-in.

OI’s scope of work:
Calculation of the forces on the HDD in several installation scenarios.

Share this page

Related projects

 
SPT Offshore

FPSO Mooring Project Suction anchor pile structural engineering

See project
 
Seaway 7

Formosa 2 OWF (2022) Project/Field Engineering for Installation of OWF Foundations

See project
 
Strohm

Lapa 6’’ Gas Injection TCP In-Place Analysis

See project
Back to top