Project description:
Hollandse Kust West Beta (HKWB) Export Cable Installation is an EPCI contract, awarded by TenneT, to Boskalis in consortium with Orient Cable (NBO). The HKWB project entails:
- Installation of two 65-kilometer-long 220kV AC Export cables, connecting the onshore grid with the HKWB Platform;
- Installation of a 9-kilometer-long 66kV AC Interlink cable, connecting the HKWB Platform with the HKWA Platform.