3D modeling of barge and steelworks for Greater Changhua OWF

H2Offshore

Project description:

The Greater Changhua offshore wind projects are scheduled to be developed on four sites in the Taiwan Strait, from 35km to 60km off the coast of Changhua County, Taiwan.

Danish offshore wind developer Ørsted has obtained site exclusivity on four offshore wind sites with a planned total generation capacity of 2.4GW.

OI’s scope of work:

Preparing a 3D model of a Barge equipped with temporary steel such as Grillage, Upending tool, ILT-installation tool and miscellaneous secondary steel such as bollards etc.

3D model is used to create a deck layout and to design an Upending tool, clashchecks and workability.