Guyana (2023) Heads Design

Van Oord

Project description:

Van Oord Offshore is developing the subsea infrastructure of the Guyana GTE Project on behalf of ExxonMobil.

As part of the subsea assets, VOO will lay a pipeline in shallow water to connect the fields to shore.

OI’s scope of work:

OI has been commissioned to design:

  • HDD String Initiation Head
  • HDD head
  • A&R head
  • Wet Buckle Recovery Frame

OI has performed Engineering and Drafting of above items in-house.

Share this page

Related projects

 
RTA Offshore

Rosebank IEPCI (2025)

See project
 
Tramontana

Fengmiao OWF Export Cable Analysis (2023)

See project
 
Tramontana

Jeonnam Offshore Wind Power

See project
Back to top