PLV upgrade & commissioning Pipeline Installation Engineering

Undisclosed client

Project description:

Commissioning of pipelay vessel to lay 48” rigid pipeline. Project focus is on vessel modifications and subsequent pipeline installation.

OI’s scope of work:

strength assessment of winch platforms at installed at bow of the vessel

  • OI was responsible for quality control of the engineering scope performed by 3rd party. The quality control contained:
      • Structural report verification
      • Strength assesment of the platforms and the hull (FEM)
      • Oonboard inspection
  • Software used for strength assessment was Ansys Mechanical workbench. OI representative assisted in mobilization process in port