Dos Bocas (2023) Lifting Plan

Van Oord

Project description:

Dos Bocas consists of 3 PLEM installation. The PLEMs are a part of 3 pipelines connecting a refinery to 3 SPM buoys for offloading and loading of hydrocarbons to the FPSOs.

OI’s scope of work :

Part of the main scope that was developing the method statements, OI provided Van Oord with storyboards, lifting plans, rigging arrangements, fabrication drawings, anchor patterns and seafastening drawings.

Share this page

Related projects

 
Allseas

Structural FEM Support

See project
 
Offshore Independents

XML Automated Reporting

See project
 
SPT Offshore

Suction Piles for Various Projects

See project
Back to top