Project description:

Dos Bocas consists of 3 PLEM installation. The PLEMs are a part of 3 pipelines connecting a refinery to 3 SPM buoys for offloading and loading of hydrocarbons to the FPSOs.

OI’s scope of work :

Part of the main scope that was developing the method statements, OI provided Van Oord with storyboards, lifting plans, rigging arrangements, fabrication drawings, anchor patterns and seafastening drawings.