Cable Installation Analysis

DEME

Project description:

  • Analysis of EFGL floating wind farm cable installation.

OI’s scope of work:

The scope of work for OI contained the analysis of:

  • Normal Lay
  • Abandonment and Recovery
  • Quayside Mooring
  • Loadout
  • Pull in
  • Overboarding of pull in components
Share this page

Related projects

 
N-Sea

Arkona Met Mast (2025)

See project
 
Bluestream

Dana F2-A Hanze 4-inch Gas Export Pipeline Installation Engineering Support

See project
 
Offshore Independents

Pipeline CO2 Transport Study

See project
Back to top