Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
DEME Offshore

Arcadis Ost - Project engineer onshore and offshore

See project
 
VBMS

Cable Handling Clamp - Design and Drafting support

See project
 
Jan de Nul

Tennet Offshore Cable System Repair

See project
Back to top