Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
SPT Offshore

F3-FA Topside Removal Structural Engineering Support

See project
 
Seaway7

Seagreen 2 OWF FEM Engineering Support

See project
 
VBMS

Cable Basket and Lift Spreader Design Engineering Support

See project
Back to top