Formosa 2 OWF (2022) Project/Field Engineering for Installation of OWF Foundations

Seaway 7

Project description:

Install the foundations (4x pin piles per location) at the OWF Formosa 2, Taiwan.

OI’s scope of work:

Project/Field Engineer(s) providing engineering support both offshore and on board Heavy Lift Vessel ”Seaway Yudin”, during the installation (via hammering) of the 4x pin piles meant for the subsequent installation of the jackets on which the wind turbine generators are situated.

Share this page

Related projects

 
Tideway

Hornsea Export Cable Platform Pull in Analysis

See project
 
Technip FMC

Karish FPSO Special Pipe Supports

See project
 
DEME Offshore

Norfolk - Export Cable support

See project
Back to top