Seaway Heavy Lifting – Analysis and Installation procedures for Perla

Seaway Heavy Lifting – Analysis and Installation procedures for Perla

Project description:

Perla gas field is an offshore gas field in the Gulf of Venezuela. The scope of work for the Perla project consists of the installation and engineering of:

  • The jackets and topsides of PP1, PS2 and PS3.
  • The umbilical, fibre optic cables (FOC) and the mattresses.
  • The 31” and 14” spool pieces, SDU and SSIV and any diver assisted works.

OI Scope:

The provision of analyses, method statements, installation procedures and proposal of required installation equipment regarding the described subsea works below:

The subsea installation scope covers the following operations:

  • Umbilical Installation from PP1 to SSIV.
  • FOC Installation from PP1 to SDU.
  • FOC 2nd end pull-in Installation for PS2 and PS3.
  • Transfer SUTH to SSIV.
  • Transfer CEM to SDU.
  • Mattress Installation (near PP1) .
  • Mattress Installation near (PS2 and PS3)