Carbon Capture Pipelines Pre-FEED

Wintershall

Project description:
Wintershall Dea Carbon Management Solutions B.V. (Company) is investigating options for a connection to the (future) Aramis CO2 trunk pipeline. This connection would involve pipelines from ILT1 of Aramis pipeline to RAT, and from RAT to the Q4-C (existing platform), and to the P6-AB (new platform near P6-A).

OI’s scope of work:

  • Review and provide recommendations for the survey scope of work.
  • Evaluate intended pipeline routes, considering pipeline laying, efficiency, platform orientations, crossings, obstacles, hazards, and third-party assets.
  • Provide overall field layouts and approach drawings.
  • Prepare a Basis of Design with all input data required for the FEED of pipelines.
  • Propose Nature Inclusive Design (NID) including providing details, reviewing potential measurements, and conducting assessments.
  • Client representative during offshore campaign on board Ocean Reliance
Share this page

Related projects

 
N-Sea

Orcaflex support - Chute Suitability Study

See project
 
Tideway

Hornsea Export Omega joint overboarding Analysis

See project
 
Bluestream

Gemini OWF (2023) Procedure Development - Reburial Exposed Power Cable

See project
Back to top