Project description:
Wintershall Dea Carbon Management Solutions B.V. (Company) is investigating options for a connection to the (future) Aramis CO2 trunk pipeline. This connection would involve pipelines from ILT1 of Aramis pipeline to RAT, and from RAT to the Q4-C (existing platform), and to the P6-AB (new platform near P6-A).
OI’s scope of work:
- Review and provide recommendations for the survey scope of work.
- Evaluate intended pipeline routes, considering pipeline laying, efficiency, platform orientations, crossings, obstacles, hazards, and third-party assets.
- Provide overall field layouts and approach drawings.
- Prepare a Basis of Design with all input data required for the FEED of pipelines.
- Propose Nature Inclusive Design (NID) including providing details, reviewing potential measurements, and conducting assessments.
- Client representative during offshore campaign on board Ocean Reliance