Cable Handling Clamp - Design and Drafting support

VBMS

Project description:

VBMS has approached Auxilium to test its cable grapper. The work consisted of:

  • Seabed preparation procedures
  • ROV procedures
  • Clamp installation and cable retrieval procedures
  • Design of the cable clamp

OI’s scope of work:

OI performed (on behalf of Auxilium) the structural verification of the cable clamp:

  • FEM Analysis of cable clamp in ANSYS.
Share this page

Related projects

 
Boskalis

Business Plan for New Product Line (LNG Market)

See project
 
Tadek Offshore

Wello Project

See project
 
R2G

Structural Analysis Pump Foundation

See project
Back to top