Project description:
Commissioning of pipelay vessel to lay 48” rigid pipeline. Project focus is on vessel modifications and subsequent pipeline installation.
OI’s scope of work:
Strength assessment of winch platforms installed at main deck at stern of the vessel
- OI was responsible for quality control of the engineering scope performed by 3rd party. The quality control contained:
-
- Structural report verification
- Strength calculation of the platforms and the hull (FEM)
- Onboard inspection
-
- Software used for strength assessment was Ansys Mechanical workbench. OI representative assisted in mobilization process in port