Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
GustoMSC

Market & Technical Analysis for DSC Offshore Construction Fleet

See project
 
Undisclosed client

PLV upgrade & commissioning Pipeline Installation Engineering

See project
 
Boskalis

Business Plan for New Product Line (LNG Market)

See project
Back to top