Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
Van Oord

Golfinho Umbilical Installation Tender Support

See project
 
VBMS

Cable Basket and Lift Spreader Design Engineering Support

See project
 
N-Sea

Project Engineering Support - Cable Repair (2024)

See project
Back to top