Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
Offshore Independents

Pipeline CO2 Transport Study

See project
 
Bluestream

Northern Maria OSV

See project
 
N-Sea

TenneT SLA

See project
Back to top