Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
N-Sea

Gwynt Moor OrcaFlex Analysis

See project
 
Tideway

Sapref Pipelines, Durban, Stress Analysis

See project
 
SPT Offshore

Projects based in South China sea and in the Gulf of Mexico Structural Engineering

See project
Back to top