Winch Reaction Forces

Tideway

Project description:

Tideway approached OI with a request to support them with engineering calculations for an 15 mT winch, which will be installed on an offshore platform.

OI’s scope of work:

  • Perform calculation of reaction forces due to the operational limits of the winch.
  • Additionally the base plate and bolts were also verified for the reaction forces.
Share this page

Related projects

 
Sproule

CCS projects Technical Due Diligence

See project
 
Bluestream

Gemini OWF (2023) Procedure Development - Reburial Exposed Power Cable

See project
 
Boskalis

Kakinada (2021) Project Engineering Support

See project
Back to top