Project description:
- The CS Sovereign is to be used for a cable repair scope at the Race bank Wind Farm in water-depths of LAT 12.5m to HAT 20.5m.
- Deburial, freelay, 1st and 2nd pull in analysis was completed.
OI’s scope of work:
- Reviewing of the operational procedures for 1st end, 2nd end and freelay
- Support with the identification critical stages
- Support the optimization of the operational configuration
- Run static and dynamic analysis to define the limiting sea state for each operation.