Hub Recovery Seafastening (2022) Engineering Support

Tadek

Project description:

Fabrication drawing and structural assessment of the seafastening grillage for recovered hub.

OI’s scope of work:

Tadek has contracted Offshore Independents to execute the following scope of work:

  • 3D model of the seafastening grillage
  • Fabrication drawing of the grillage
  • Structural report

 

Service(s)

Share this page

Related projects

 
Undisclosed client

PLV upgrade & commissioning Pipeline Installation Engineering YoYo test

See project
 
Van Oord

Golfinho - Design of Pipeline heads

See project
 
Tideway

Sapref Pipelines, Durban, Stress Analysis

See project
Back to top