Project description:
Fabrication drawing and structural assessment of the seafastening grillage for recovered hub.
OI’s scope of work:
Tadek has contracted Offshore Independents to execute the following scope of work:
- 3D model of the seafastening grillage
- Fabrication drawing of the grillage
- Structural report