Hub Recovery Seafastening (2022) Engineering Support

Tadek

Project description:

Fabrication drawing and structural assessment of the seafastening grillage for recovered hub.

OI’s scope of work:

Tadek has contracted Offshore Independents to execute the following scope of work:

  • 3D model of the seafastening grillage
  • Fabrication drawing of the grillage
  • Structural report

 

Service(s)

Share this page

Related projects

 
Boskalis

Hollandse Kust West Beta

See project
 
Boskalis

Revolution Wind

See project
 
Crowley

RAMS support for Transport Lift (2025)

See project
Back to top