Hub Recovery Seafastening (2022) Engineering Support

Tadek

Project description:

Fabrication drawing and structural assessment of the seafastening grillage for recovered hub.

OI’s scope of work:

Tadek has contracted Offshore Independents to execute the following scope of work:

  • 3D model of the seafastening grillage
  • Fabrication drawing of the grillage
  • Structural report

 

Service(s)

Share this page

Related projects

 
SPT Offshore

FPSO Mooring Project Suction anchor pile structural engineering

See project
 
Seaway 7

Seagreen (2021) Scour Protection

See project
 
Tideway

Hornsea Export Cable Platform Pull in Analysis

See project
Back to top