Marine / Project engineering

Dimension

Project description:

  • Cable installation:
  • TPC2 wind farm
  • Inter array and export cables
  • Analysis
  • Method statements
  • Drafting

OI’s scope of work:

  • Analysis, method statements and drafting for:
  • Cable lay
  • Pull in
  • On bottom stability
  • Shore landing (HDD+float-out)
Share this page

Related projects

 
Gasunie

LNG Terminal Eemshaven (2022) Vent Fatigue Assessment

See project
 
Strohm

TCP Sensitivity Analysis

See project
 
Boskalis

Young Engineering Professional Trainee Program

See project
Back to top