Marine / Project engineering

Dimension

Project description:

  • Cable installation:
  • TPC2 wind farm
  • Inter array and export cables
  • Analysis
  • Method statements
  • Drafting

OI’s scope of work:

  • Analysis, method statements and drafting for:
  • Cable lay
  • Pull in
  • On bottom stability
  • Shore landing (HDD+float-out)
Share this page

Related projects

 
Offshore Independents

SolidWorks Automation (2023)

See project
 
Tideway

Hornsea Export Cable Platform Pull in Analysis

See project
 
Jan de Nul

Tennet Offshore Cable System Repair

See project
Back to top