Marine / Project engineering

Dimension

Project description:

  • Cable installation:
  • TPC2 wind farm
  • Inter array and export cables
  • Analysis
  • Method statements
  • Drafting

OI’s scope of work:

  • Analysis, method statements and drafting for:
  • Cable lay
  • Pull in
  • On bottom stability
  • Shore landing (HDD+float-out)
Share this page

Related projects

 
Boskalis

Business Plan for New Product Line (LNG Market)

See project
 
Boskalis

Viking Bravo Project Engineering

See project
 
RTA Offshore

Rosebank IEPCI (2025)

See project
Back to top