Marine / Project engineering

Dimension

Project description:

  • Cable installation:
  • TPC2 wind farm
  • Inter array and export cables
  • Analysis
  • Method statements
  • Drafting

OI’s scope of work:

  • Analysis, method statements and drafting for:
  • Cable lay
  • Pull in
  • On bottom stability
  • Shore landing (HDD+float-out)
Share this page

Related projects

 
Seaway 7

Seagreen (2021) Scour Protection

See project
 
Petrogas

Pipeline Cleaning Projects (2022) Technical Scope Review

See project
 
Boskalis

Young Engineering Professional Trainee Program

See project
Back to top