Mozambique LNG

Subcon

Project description:

Pipeline stability under turbidity loads

OI’s scope of work:

Three Pipelines subjected to strong tubidity currents are protected with concrete mattresses.

Level 1 stability analyses have been performed to demonstrate the pipelines/mattresses integrity.

Share this page

Related projects

 
N-Sea

Gwynt Y Môr - Cable Repair Analysis Support

See project
 
Boskalis

CPS stabilization - Rock bag installation

See project
 
Seaway 7

Hollandse Kust Zuid (2022) Field Engineer for Monopile installation

See project
Back to top