Mozambique LNG

Subcon

Project description:

Pipeline stability under turbidity loads

OI’s scope of work:

Three Pipelines subjected to strong tubidity currents are protected with concrete mattresses.

Level 1 stability analyses have been performed to demonstrate the pipelines/mattresses integrity.

Share this page

Related projects

 
Crowley

RAMS support for Transport Lift (2025)

See project
 
Petrogas

Helder M7 removal (2022) Structural Engineering

See project
 
Gasunie

LNG Terminal Eemshaven (2022) Vent Fatigue Assessment

See project
Back to top