Mozambique LNG

Subcon

Project description:

Pipeline stability under turbidity loads

OI’s scope of work:

Three Pipelines subjected to strong tubidity currents are protected with concrete mattresses.

Level 1 stability analyses have been performed to demonstrate the pipelines/mattresses integrity.

Share this page

Related projects

 
Tadek

Hub Recovery Seafastening (2022) Engineering Support

See project
 
Jan de Nul

Tennet Offshore Cable System Repair

See project
 
Petrogas

Pipeline Cleaning Projects (2022) Technical Scope Review

See project
Back to top