Mozambique LNG

Subcon

Project description:

Pipeline stability under turbidity loads

OI’s scope of work:

Three Pipelines subjected to strong tubidity currents are protected with concrete mattresses.

Level 1 stability analyses have been performed to demonstrate the pipelines/mattresses integrity.

Share this page

Related projects

 
OEG Subsea

ICCP BUOY INSTALLATION -Cable Installation Analysis

See project
 
K-Bets

YOKJI OWF - Cable Laying and Burial Method Statement

See project
 
Boskalis

Ostwind 2 - Engineering Support

See project
Back to top