Mozambique LNG

Subcon

Project description:

Pipeline stability under turbidity loads

OI’s scope of work:

Three Pipelines subjected to strong tubidity currents are protected with concrete mattresses.

Level 1 stability analyses have been performed to demonstrate the pipelines/mattresses integrity.

Share this page

Related projects

 
Seaway 7

Seagreen OWF Suction Caisson Jacket foundations installation (2022) Geotechnical Engineer (Client Rep. o/b Saipem 7000)

See project
 
Offshore Independents

SolidWorks Automation (2023)

See project
 
Gasunie

LNG Terminal Eemshaven (2022) Vent Fatigue Assessment

See project
Back to top