Mozambique LNG

Subcon

Project description:

Pipeline stability under turbidity loads

OI’s scope of work:

Three Pipelines subjected to strong tubidity currents are protected with concrete mattresses.

Level 1 stability analyses have been performed to demonstrate the pipelines/mattresses integrity.

Share this page

Related projects

 
R2G

Structural Analysis Pump Foundation

See project
 
Van Oord

Dos Bocas (2023) Lifting Plan

See project
 
Bluestream

Nexstep (2022) Sea fastening on Ievoli Ivory Deck

See project
Back to top