Project description:
- Torture project – Hang-off and Portal frame, push bars, PLET cage (Pioneering Spirit)
-
- Design of a1000t Hang-off frame for J-lay pipe in ultra deep sea (2500m)
- Design of a Portal frame for 2x500t A&R wires
- Design of a PLET push bar
- Design of a PLET cage (to support PLET during welding connection to the pipe)
- Design of access platforms for Hang-off frame and Portal frame
- PS mooring foundation additional winch and rollers (Pioneering Spirit)
- One Dias project – Hammer pile hang-off frame (Lorelay)
- Tensioner foundation stiffening (Sandpiper)
- LCA Skid foundation (Solitaire)
OI’s scope of work:
Structural design and improvement calculations and reporting for all items mentioned above