Suriname Block 58

Strohm

Project description:

The Suriname B58 PROJECT is a conventional greenfield development consisting of a subsea network tied back to an FPSO located in approximately 400 m WD. Strohm is planning to develop Suriname B58 Central Area, located in Block 58 (SITE), approximately 170 km Northwest of Paramaribo, offshore Suriname.

OI’s scope of work:

  • Normal Lay analysis for a 140m length TCP jumper in 96m WD
  • Sensitivity analysis for on-bottom tensions
  • Dynamic analysis
  • Curve stability analysis as per DNV RP C205
Share this page

Related projects

 
DEME Offshore

Norfolk - Export Cable support

See project
 
Seaway 7

Hollandse Kust Zuid (2022) Project Representative

See project
 
Tideway

Hornsea Export Cable Platform Pull in Analysis

See project
Back to top