Projects based in South China sea and in the Gulf of Mexico Structural Engineering

SPT Offshore

Project description:

SPT requested OI to provide engineering support regarding the structural design of suction piles for multiple projects based in South China sea and in the Gulf of Mexico.

The purpose of the suction anchor piles were to support subsea manifold equipment at 350m water depth while the others were mooring anchor piles for an FPSO at 2500m water depth.

OI’s scope of work:

  • Basis of Design reports
  • Structural Design reports
  • Calculations and drawing sketches
  • Drawing checks
  • Response to client comments
  • Final Issue for Construction

.