Project description:

Subsea 7 is the EPRD contractor of the Markham ST-1 platform removal project. Seaway 7 scope consists of engineering, hook-down, removal and transportation to dismantling yard of platform structures.

OI’s scope of work:

Seaway 7 requested OI to support them with the engineering works for platform removal. The following tasks have been performed:

  • Structural Verification of Jacket Integrity during cutting, lifting and transportation
  • Engineering checks of various reports
  • Perform Project Engineering tasks like subcontractor coordination, mobilization support, equipment lists, preparing manuals
  • Offshore support – Field Engineering during execution on board HLV
Share this page

Related projects

 
Offshore Independents

Internal Project (2022) Floating Wind Installation Analysis

See project
 
Veegeo

Onshore Thermal Drilling Project - Drafting Support

See project
 
Bluestream

Dana F2-A Hanze 4-inch Gas Export Pipeline Installation Engineering Support

See project
Back to top