Hollandse Kust Zuid (2022) Project Representative

Seaway 7

Project description:

Transport and installation of monopiles and secondary steel for the Hollandse Kust Zuid (HKZ) wind park.

OI’s scope of work:

Project representative at SIF yard for the load out of monopiles / secondary structure.

Share this page

Related projects

 
RTA Offshore

Umbilical Load Out Analysis, Moss Norway

See project
 
SPT Offshore

BOP foundations Installation Engineering

See project
 
Seaway 7

Yunlin (2022) Tender support

See project
Back to top