Structural Analysis Pump Foundation

R2G

Project description:
OI was contracted by RED-TO-GREEN to perform the preliminary design of an onshore steel-framed structure supporting mechanical equipment (1x water tank, 3x centrifugal pumps).

OI’s scope of work:

  • Pre-design of structural members
  • Assessment of maximum deflections in operating conditions
  • Identification of natural frequencies and potential resonance risks.
Share this page

Related projects

 
N-Sea

Gwynt Y Môr - Cable Repair Analysis Support

See project
 
Red 2 Green

Redesign of Navigation mast and Exhaust for patrol vessel

See project
 
Strohm

TCP Sensitivity Analysis

See project
Back to top