Structural Analysis Pump Foundation

R2G

Project description:
OI was contracted by RED-TO-GREEN to perform the preliminary design of an onshore steel-framed structure supporting mechanical equipment (1x water tank, 3x centrifugal pumps).

OI’s scope of work:

  • Pre-design of structural members
  • Assessment of maximum deflections in operating conditions
  • Identification of natural frequencies and potential resonance risks.