Redesign of Navigation mast and Exhaust for patrol vessel

Red 2 Green

Project description:

The De Haas project focuses on optimizing the exhaust and ventilation systems for the patrol vessel, as well as redesigning the navigation mast. The main challenge addressed by the project is the optimization of exhaust performance. In addition, there are proposed changes to the ventilation design. According to ADN rules from ES-TRIN, the air intake must be positioned 0.5 meters above the deck. The goal of the project is to ensure compliance while improving overall functionality and efficiency.

OI’s scope of work:

Provide project engineering support to Red2Green

It included sketches to visually represent the different design choices.