Structural Analysis

R2G

Project description:
This project involves the structural modification of the research vessel RWS Asterias to enable the installation of a spud pole, a key element designed to improve the vessel’s stability and operational performance during offshore activities. The modification supports enhanced capabilities for precise subsea operations.

OI’s scope of work:

OI’s scope of work focused on performing structural analysis using ANSYS to evaluate the vessel’s  local structure. The purpose of the analysis was to confirm that the vessel could safely support the additional loads from the spud pole installation, meeting all applicable safety requirements.

Share this page

Related projects

 
Technip FMC

Karish FPSO Special Pipe Supports

See project
 
Port of Rotterdam

CO2 Pipeline Feasibility Study and Preliminary Design

See project
 
Bluestream

Petrogas Helm Project Engineering/Decommissioning Support

See project
Back to top