Project Engineering Support - Cable Repair (2024)

N-Sea

Project description:
From 2021 till 2024 N-Sea was contracted to perform several subsea power cable repair projects in the Irish Sea and the North Sea.

OI’s scope of work:
N-Sea has contracted OI to provide Project Engineering support for the Subsea Cable Department. The work involved:

  • Preparing Technical proposals for the Tendering Department
  • Preparing Execution Documentation for the Cable Repair/Installation projects:
    • Cable lay procedures
    • Anchor handling operations
    • Cable de-burial and recovery operations
    • Cable jointing operations
  • Define technical requirements for the procurement of cable installation equipment
  • On site operational support
Share this page

Related projects

 
Offshore Independents

Internal Project (2022) Behaviour of suction bucket caissons during transportation

See project
 
DEME Offshore

Doggerbank OWF (2022-2023) Inter Array Cable and Export Cable Installation Analysis

See project
 
Subcon

Mozambique LNG

See project
Back to top