Gwynt Moor OrcaFlex Analysis

N-Sea

Project description:

Providing OrcaFlex support for cable repair analysis.

OI’s scope of work:

N-Sea requested the following simulations:

  • Normal lay statics and dynamics
  • Abandonment and recovery statics
  • Inline joint overboarding statics
  • Omega joint overboarding statics
  • With floating barge
  • With jack-up barge

Based on the static simulations, recommendations were given about the solutions with best workability and rigging setup to properly handle the cable joint

Share this page

Related projects

 
SPT Offshore

BOP foundations Installation Engineering

See project
 
Boskalis

Bokalift 2 (2023) Installation Equipment Outfitting Works

See project
 
DEME Offshore

Doggerbank OWF (2022-2023) Inter Array Cable and Export Cable Installation Analysis

See project
Back to top