Gwynt Moor OrcaFlex Analysis

N-Sea

Project description:

Providing OrcaFlex support for cable repair analysis.

OI’s scope of work:

N-Sea requested the following simulations:

  • Normal lay statics and dynamics
  • Abandonment and recovery statics
  • Inline joint overboarding statics
  • Omega joint overboarding statics
  • With floating barge
  • With jack-up barge

Based on the static simulations, recommendations were given about the solutions with best workability and rigging setup to properly handle the cable joint

Share this page

Related projects

 
Seaway7

Markham ST-1 removal Engineering Support

See project
 
Sproule

CCS projects Technical Due Diligence

See project
 
IRM systems

Above Water Tie-Ins (AWTI) Static Analysis

See project
Back to top