Suriname Block 58

Strohm

Project description:

The Suriname B58 PROJECT is a conventional greenfield development consisting of a subsea network tied back to an FPSO located in approximately 400 m WD. Strohm is planning to develop Suriname B58 Central Area, located in Block 58 (SITE), approximately 170 km Northwest of Paramaribo, offshore Suriname.

OI’s scope of work:

  • Normal Lay analysis for a 140m length TCP jumper in 96m WD
  • Sensitivity analysis for on-bottom tensions
  • Dynamic analysis
  • Curve stability analysis as per DNV RP C205
Share this page

Related projects

 
Petrogas

Helder M7 removal (2022) Structural Engineering

See project
 
ESD

Expert Cable Installation Consulting

See project
 
Undisclosed client

PLV upgrade & commissioning Pipeline Installation Engineering - Diverter beam project

See project
Back to top